* mixer content (floating, pulp precipitate, pulp outflow);
 
* mixer content (floating, pulp precipitate, pulp outflow);
 
* digester (fermentation values and digestate)
 
* digester (fermentation values and digestate)
* surnatants
+
* supernatants
  
 
Main process data monitored are:
 
Main process data monitored are:
Line 85: Line 85:
 
While pressure regulation and feeding can be done continuously, changes in distance between piston and cylinder and subtitution of screens must be off-line, with mechanical operations.
 
While pressure regulation and feeding can be done continuously, changes in distance between piston and cylinder and subtitution of screens must be off-line, with mechanical operations.
  
Adjustments on mixer are about rotation speed and the height of suction pump.
+
Adjustments on mixer are about the height of suction pump require interventions, while calibration on rotation speed can be done online.
  
Ajustments on digester are about 
+
On digester there are mainly calibrations to be done (regulation of input flow, humidity and features and gas abstraction).
  
 +
Optimisation of digestate dewatering require adjustment of polyelectrolyte processing.
  
== Constraints and assumptions ==
+
Routine analyses of supernatants (PS DVS COD NH3 TKN Ptot) gives information about the need of ammonia stripping.
  
Indicate what may prevent you from implementing the action as planned and what will be done to address this risk. Please ensure that these constraints and assumptions are in line with those indicated on Form B5.
+
== Constraints and assumptions  ==
 +
* Constraints
 +
** Test, measurement, characterization and calibration methods must comply with national and community rules
 +
** Adjustment, balancing and calibration must be completed on schedule in order to leave significant time for running the demonstration action.  
 +
* Assumptions
 +
** No disrupting change will occur in inflows (OFMSW and sludges) during test and adjusting
 +
** The internal laboratory is sufficient for most on-the-fly analyses
 +
** Turnover of key project resources is low.
  
 
== Beneficiary responsible for implementation ==
 
== Beneficiary responsible for implementation ==
  
Please indicate which of the project's beneficiaries will be in charge of the implementation of each action. Should more than one beneficiary be implicated, please give full details of which beneficiary is responsible for what.
+
P1 - SEARIS
  
 
== Expected results ==
 
== Expected results ==
 +
Main results of this action are
 +
* full scale commissioning of COWS, including:
 +
** pre-treatmmet prototype working at optimal regime;
 +
** full COWS process running at full sludge and OFMSW inflow capacity
 +
* sending of OFMSW to composting halted.
  
Please indicate (preferably in bullet points) the quantified/measurable results/outputs from the action. Please indicate whether they will be used in other actions and how.
+
Deliverable D5 - COWS performance report will document the achievements.
 +
 
 +
== Where and when  ==
 +
This action will take place at plant site in Viareggio.  
 +
 
 +
Action start: 16/01/2015
 +
 
 +
Action end: 27/08/2015
  
 
== Indicators of progress ==
 
== Indicators of progress ==
  
Please indicate how progress of this action will be measured.
+
 
The descriptions may be accompanied by explanatory graphs, tables or pictures which may be included in the forms by using the “Pictures” check box.
 
  
 
== Notes and References ==
 
== Notes and References ==
 
<references />
 
<references />

Revision as of 10:38, 15 July 2011

B3 - Test run
Batch digestion tests with controlled input
Calibration of COWS subsystem
Incremental optimisation of the full process
Test of operational limits
M - Validation of full scale COWS process
D5 - COWS performance report

Description and methods employed (what, how, where and when)

The main purpose of this action is to get:

  • optimal processing through the COWS pre-treatment prototype subsystem;
  • optimal overall performance of the plant

In order to achieve this goal adjustment and balancing of process parameters are to be done.

Adjustments of COWS pre-treatment prototype subsystem depend on the technology adopted; they are anyway similar in both cases of screw-press and piston-press (the most probable technologies). It would be different for hydro-mechanical separation.

We take as reference the extrusion process.

In order to evalute the performance of pre-treatment unit (COWS prototype) the presence of contaminants will be consider the principal factor. Tests include both chemical, physical, and ingredient analyses. The following contaminants/contrary materials are measured (relative to the organic fraction)

  • Putrescible
  • Plastics
  • Metals
  • Glass
  • Textiles
  • Wood
  • Paper
  • Inerts

Adjustments should consider the performance of each stage and the effects on subsequent steps. Characterization will be made at each step on residuals and in-flow materials, starting from influent OFMSW characterisation. Following steps are:

  • after pre-treatment, out of the press/screw system;
  • mixer content (floating, pulp precipitate, pulp outflow);
  • digester (fermentation values and digestate)
  • supernatants

Main process data monitored are:

  • Chemical composition of OFMSW and WAS influent (average monthly)
    • TS, g/kg
    • TVS, %TS
    • TCOD, mgO2/l
    • TKN, mgN/l
    • Ptot, mgP/kgTS
    • Alkalinity, mgCaCO3/l
    • pH
  • Operational conditions in the reactor
    • Feed caracteristics
      • Material
      • TS feed, %
      • TVS feed, %TS
    • Operational conditions
      • OLR (kgTVS/m3reactor day)
      • HRT (days)
      • Digester temperature, °C
    • Process parameters
      • pH
      • Alkalinity (@pH 6), gCaCO3/l
      • Alkalinity (@pH 4), gCaCO3/l
      • Volatile fatty acids, mgCOD/l
      • TS reactor, %
      • TVS reactor, %TS
    • Yields
      • GP, m3biogas/twaste
      • GPR, m3biogas/m3reactor day
      • SGP, m3CH4/kgTVSfeed
      • SGPsludge, m3CH4/kgTVSfeed
      • SGPofmsw, m3CH4/kgTVSfeed
      • CH4, %
      • TVS removal, %


Foreseen adjustment of the prototype considering the case of extruder technology can be done acting mainly on the following:

  • extruder piston pressure (or cochlea speed);
  • distance between piston (or cochlea) and the head of extrusion chamber;
  • screen patterns (hole diameter and distribution).

While pressure regulation and feeding can be done continuously, changes in distance between piston and cylinder and subtitution of screens must be off-line, with mechanical operations.

Adjustments on mixer are about the height of suction pump require interventions, while calibration on rotation speed can be done online.

On digester there are mainly calibrations to be done (regulation of input flow, humidity and features and gas abstraction).

Optimisation of digestate dewatering require adjustment of polyelectrolyte processing.

Routine analyses of supernatants (PS DVS COD NH3 TKN Ptot) gives information about the need of ammonia stripping.

Constraints and assumptions

  • Constraints
    • Test, measurement, characterization and calibration methods must comply with national and community rules
    • Adjustment, balancing and calibration must be completed on schedule in order to leave significant time for running the demonstration action.
  • Assumptions
    • No disrupting change will occur in inflows (OFMSW and sludges) during test and adjusting
    • The internal laboratory is sufficient for most on-the-fly analyses
    • Turnover of key project resources is low.

Beneficiary responsible for implementation

P1 - SEARIS

Expected results

Main results of this action are

  • full scale commissioning of COWS, including:
    • pre-treatmmet prototype working at optimal regime;
    • full COWS process running at full sludge and OFMSW inflow capacity
  • sending of OFMSW to composting halted.

Deliverable D5 - COWS performance report will document the achievements.

Where and when

This action will take place at plant site in Viareggio.

Action start: 16/01/2015

Action end: 27/08/2015

Indicators of progress

Notes and References